 |
 |
 |
 |
 |
Why Outsource?
- Reduce & control operating costs
- Improve company focus
- Gain access to world-class capabilities
- Free up internal resources
- Access resources not available internally
- Concentration on core competencies
- Gain control of difficult to manage functions (processes)
- Make capital funds available
- Share risks
- Save Cost
Key Service Elements
- Product Evaluation
- Project Management
- Source Selection
- Engineering Coordination
- Quality Assurance & Plan
- Cost Reduction
- New Product Introduction
- Product Revitalization (Reengineering)
|
Vendors & Partners
- Electrical & Mechanical Sub-contractors, ranging in size from small to very large.
- Plastic Injection Molding houses with the capability of sophisticated mold design, tool fabrication, painting, and plating, including double injection molding.
- Metal Fabrication Houses with tooling fabrication, plating, & painting.
Why Asia Connections?
- 35 year history manufacturing in Asia.
- Dedicated team of professionals that provide local interface with clients in the US and suppliers in Asia.
- Full service manufacturing & outsourcing project management provided.
- Extensive network of suppliers to assure a proper match to your requirements.
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
Analysis of Clients Needs
- Product definition, drawings, samples.
- Outsourcing analysis, pros & cons.
- Quality, inspection, & test criteria.
- Cost analysis & customer expectations.
- Yearly volume, forecast, past history.
- Scheduling considerations.
- Delivery logistics, duties, shipping.
Selecting the Right Supplier
- Match supplier to project requirements.
- Qualified suppliers.
- Selection of one to three suppliers.
Supplier Review
- Requirements reviewed with suppliers.
- Determine ability to meet client needs.
- Preliminary project plan developed.
- Initial cost estimate completed.
- Proposal completed.
|
Client Review
- Presentation of proposal.
- Source selection criteria & description.
- Tooling needs and schedule.
- Cost analysis and formal quote review.
- Projected savings reviewed.
- Methods of payment are reviewed.
Next Steps
- Agreement signed.
- Project Manager appointed.
- Opportunity for tooling modifications.
- Purchase order generated by client.
- Purchase order placed with supplier.
Regular Project Reviews
- As required.
- Asia trips for US client personnel.
- Samples provided.
- Mass production.
|
u |